G

Gayatri Infrastructure

Visakhapatnam Est. 2000

3.0

Average

Based on 2 ratings across 1 project

1

Projects Listed

2

Total Ratings

3

Discussions

Rating Breakdown

5
00%
4
00%
3
2100%
2
00%
1
00%

About Gayatri Infrastructure

Gayatri Infrastructure is a Visakhapatnam-based developer with residential projects across the city's prime and suburban areas.

Properties on IndiaPropertyTalk(1)

Vadodara cityscape
Vadodara
Apartment / Flat

Gayatri Greens Waghodia Road

Gayatri Greens is a new launch on Waghodia Road by Gayatri Infrastructure — a local Vadodara developer who has previously delivered two smaller projects. This is their most ambitious project yet in terms of scale: 180 units across four wings, which is a meaningful step up from their earlier 48-unit and 72-unit projects. Waghodia Road is developing because of two drivers: the PCPIR (Petroleum, Chemicals and Petrochemicals Investment Region) planned development in this direction, and the relative land affordability compared to Gotri or Maneja. Several housing finance companies have pre-approved this area for loan disbursements which is itself a sign of institutional confidence. The project: 2BHK starting at ₹42 lakh and 3BHK up to ₹60 lakh. Launch response has been reasonable — the developer claims 35% booked in the first six weeks which I tentatively believe because the price-to-location ratio is genuinely attractive. Early bookings get preferred floor and unit selection which drives this initial momentum. Now for my caution: this is a developer scaling up significantly. Going from 48 units to 180 units in a single project is a construction management challenge. Their track record on smaller projects was decent but larger projects test financial management, contractor coordination, and supply chain in ways that small projects don't. I would want to see the project at 30-40% construction completion before committing my full payment. RERA registration: confirmed, I downloaded the certificate. Possession promised late 2027, which is a 2.5 year horizon from launch — realistic for a project of this scale if they start immediately. My current posture: watching. If construction starts actively within the next 3 months and a 10% token amount booking option is available, I would participate at that level. Full payment commitment I would make at 30% construction stage.

₹38.00 L – ₹65.00 L

3.0(2)
34